ARTICLE 07

Planning IT/OT segmentation for a plant

Why office and production networks are separated, and how to cut over without stopping production.

Why separate them

The office network browses and receives mail, with wide exposure to the outside. Production equipment values stability and often goes years without updates. On one network, an office problem can reach the line directly.

How segmentation is done

Office and production each have their own segment, with a firewall between them opening only the necessary paths. Remote maintenance goes through a controlled channel and is logged.

Cutting over without stopping production

Audit the equipment and what talks to what, run the new design alongside the old network, then cut over zone by zone during maintenance or downtime, confirming each batch before the next.

Key point

Segmentation starts with an inventory: what equipment exists and what needs to talk to what.

This article is general guidance and contains no measured data; actual planning follows a site assessment.

Your next smart project starts with a good plan.

New build, upgrade or multi-brand integration: DIGI4Q helps you assess the technical direction, budget and long-term growth.

Start my project assessment