How we work
Five stages, one point of contact
DIGI4Q coordinates technical planning, equipment selection and installation partners, so progress and deliverables are always clear.
- 01 · DISCOVERDiscoverUnderstand the site, current setup, pain points, usage and budget.
- 02 · DESIGNDesignPlan topology, security zones, equipment and room to expand.
- 03 · INTEGRATEIntegrateSupply equipment, coordinate qualified installation partners and confirm compatibility.
- 04 · DELIVERDeliverTest against the agreed items and hand over drawings, lists and acceptance records.
- 05 · SUPPORTSupportMaintenance, tuning and expansion planning within the agreed scope.
| Stage | What we do | What you receive |
|---|---|---|
| 01 · DISCOVER Discover | We learn about the site, existing equipment, problems, usage and budget in an on-site visit of about 60 minutes, free of charge. | A summary of the current state and initial advice |
| 02 · DESIGN Design | We propose topology, security zones and equipment, and explain the expansion path and each cost item. | Architecture diagram, equipment list and quotation |
| 03 · INTEGRATE Integrate | We supply equipment, confirm cross-system compatibility and schedule the work with qualified installation partners. | Work schedule and division of responsibilities |
| 04 · DELIVER Deliver | After deployment each agreed item is tested on site. If the agreed figures are not met, the job is not finished. | Layout drawings, cable schedule, test records and account handover |
| 05 · SUPPORT Support | Within the agreed scope we provide inspections, updates and anomaly alerts, and extend the same architecture when you expand. | Annual care records and expansion advice |
On-site cabling and installation are carried out by qualified third-party partners; DIGI4Q is responsible for planning, coordination, testing and acceptance.
Deliverables
At handover you receive three engineering documents
- AP layout and cabling drawing.Where every cable runs from the rack and what it connects to, drawn on your floor plan.
- Rack layout and cable schedule.How the rack is arranged and what each numbered cable is for, so future maintenance does not start from scratch.
- Coverage map and test record.Meeting rooms, desks and lounges are measured one by one at acceptance and the figures go on the acceptance sheet.